Taichung Dayuanbai continuous water technology project

Taichung Dayuanbai continuous water technology project: 2022/12/21 branch opening project

In terms of traditional construction methods, whether it is water pipe maintenance or equipment expansion, it is necessary to stop the water and empty the fluid in the pipe. There will also be problems such as water pollution in the process.

After Xiangtai’s continuous water technology went to the Taichung Metro Park site survey, it designed a construction plan suitable for Taichung Metro Park, and conducted product assembly tests through simulating the on-site environment to confirm that it can achieve the best completion and safety engineering quality, and the construction process It will not affect the operation of Far East Taichung and reduce the overall construction cost.

Taichung Far East

(Continuous water technology construction method: divergent opening)