Shuanghe Hospital continuous water technology project: 2022/11/21 250x150x4 branch construction
The hospital is one of the few institutions that cannot cut off water and electricity. In order to ensure that the normal operation of the hospital will not be affected during the construction period, the Xiangtai team went to the site to conduct site surveys and measurements in advance, and provided scheme design for the hospital’s reference. After the evaluation was feasible, assembly testing and construction quality control were carried out. , To ensure continuous water engineering benefits, save water resources, and uninterrupted medical services.