Taiwan Blood Foundation Taipei Blood Donation Center Continuous Water Technology Project: 2023/2/8 Different Construction Method
After the Xiangtai team went to the site to investigate, they found that the blood storage room was next to the construction site. In order not to affect the operation of the blood storage room, the Xiangtai team adopted the standard operating procedure of the Japanese continuous water technology project, and confirmed the feasibility of the scheme from the design and assembly test Afterwards, they went to the construction site of the Taipei Blood Donation Center to carry out continuous water perforation operations. During the process, there was no impact on the blood storage room or the center building, and the goal of donating blood to save lives was achieved.